Reference | TA/20100920/03/P |
Date | 9/20/2010 |
Location | Middle East |
Scope | Supply of # 3 electrostatic desalter skid (including vessel, mixer, transformer, electrical parts, instrument and control system, piping, structure steel etc.) for Central Processing Facilities (CPF1) station in the field. Operating Conditions: Fluid: Mixture of Oil and Water Operating Temperature: 90°, Operating Pressure: 0.4 Mpag, Crude Oil Capacity (Each): 220 m3/h, Inside Diameter: 3600 mm, Shell Length (S/S): 18000 mm. Contract Duration: 30 months. |
Bid Bond | USD 500,000.00 |
Offer Validity | 90 days |
Documents Price | USD 200.00 |