Scope |
The facilities in the NGL-3 Plant at Mesaieed include Acid Gas Removal Unit (AGR) which consists of two trains one and two each having a seawater cooling system. Contractor shall carry out review of the Engineering and Detailed Design as required, Procurement, Installation, Construction, Pre-Commissioning, Commissioning and Testing of an additional sea water filtration system for the AGR units (1&2) at NGL-3 Plant by providing two Duplex Filters at the inlet of sea water lines entering each train. These filters shall be equipped with required isolation facilities, associated piping and instrumentation, as to operate one filter and keep the other one as standby in order to reduce Plant upset, production loss, methanol consumption and maintenance cost. |