Reference | LT10109600 |
Date | 11/11/2010 |
Location | Middle East |
Scope | Contractor shall carry out implementation of the following four Mechanical Plant Change Requests (PCRs) at NGL-4 Plant in Mesaieed. The work includes Procurement, Material Supply, Installation / Construction, Inspection, Testing, Pre-Commissioning and Commissioning activities - PCR/OEE/GP/07/293 - Pipe & Vessel modifications. - PCR/OEE/GP/08/311- The fuel gas line crossing KT 8501 A/B turbine to be flanged. - PCR-OEE/GP/09/336 - Replacement of current DSO transfer line with 316L materials. - PCR/OEE/GP/10/338 - Desalination Water Interconnection between NGL 1 & 2 and NGL 4Plant Mesaieed. |
Bid Bond | QAR 50,000.00 |
Bond Validity | 150 days |
Offer Validity | 120 days |
Documents Price | QAR 200.00 |