Reference | GT10111700 |
Date | 12/16/2010 |
Location | Middle East |
Scope | The company requires the following work to be carried out as an Engineering, Procurement, Installation and Commissioning (EPIC) Package of new facilities at crude oil tank farm, Mesaieed containing the following: settlement survey of crude oil storage tanks in tank farm, settlement survey of product storage tanks in NGL Plant, construction of a new diesel storage tank at tank farm, repair of naphtha tank bund wall in tank farm. Contractor shall carry out, traverse and level surveys of existing survey control stations, carry out settlement surveys of existing facilities, establish settlement survey points, conduct base line, settlement and control surveys and install new settlement and control survey points as required. The work shall consist of two (2) phases: - An initial phase to verify existing site survey control stations, survey existing settlement survey points, establish new site survey control stations and settlement survey points and conduct baseline settlement survey for new settlement survey points for all of the listed facilities. - Final phase will be a return visit after ten (10) months to verify the site survey control stations and carry out a repeat settlement survey for all settlement survey points for all of the listed facilities. Work shall include all aspects of site investigation, survey, document retrieval, design, engineering, procurement, fabrication and installation for new settlement survey points, baselines, settlement and control station surveys, preparation and submission of survey reports. Contractor shall carry out engineering, procurement, installation and commissioning of the new diesel storage tank. Including the following: Horizontal cylindrical tank supported on factory cradle supports on concrete foundations, local truck filling point connected to Tank Inlet Nozzle, diesel filtering on supply line, second containment wall to NFPA-30, maintenance ladder and top platform with handrails. Contractor shall break up the existing 150 mm thick concrete embankment cladding and dispose off site, trim and compact the embankment, supply, place & compact sub base material, reconstruct reinforced concrete embankment cladding with joints and joint sealant. |
Bid Bond | QAR 100,000.00 |
Bond Validity | 150 days |
Offer Validity | 120 days |
Documents Price | QAR 500.00 |