Reference | BID-12372 |
Date | 1/4/2011 |
Location | Africa |
Scope | Mobilization of rig 6 with all its equipments and camp from the current well (A 85-32) in the Bahi field to the intesar field for a distace of approximately 450 Km. With the knowledge that the number of loads as follows: - No. of natural loads (57). - No. of horizontal loads (16). So that the total loads is (73), required to provide a number of 25 trucks (50 ton) load equipped with loading String, meet all safety procedures and the needed fuel. |
Bid Bond | 5% of the proposed |