Reference | LT11100300 |
Date | 1/10/2011 |
Location | Middle East |
Scope | Produced water from the storage tanks at KM, FM and Jaleha degassing stations is to be utilized as injection water under this project. Additionally existing produced water lines from tanks to disposal wells are proposed to be replaced with new FBE Coated (piping) / HDPE lined (pipeline) pipes. The objective of this project is to: 1) Eliminate disposal of produced water from storage tanks at KM, FM and Jaleha into the aquifer. 2) Supplement injection water by utilizing this waste produced water from storage tanks. |
Bid Bond | QAR 100,000.00 |
Bond Validity | 150 days |
Offer Validity | 120 days |
Documents Price | QAR 200.00 |