Reference | BID-12380 |
Date | 1/9/2011 |
Location | Africa |
Scope | The company plans to mobilize the drilling rig no. (7) with all its equipment and camp from drilling the well (V32 -NC8) to drill well (Q12-NC7) in Hamada field for a distance of approximately130 km. With the knowledge that the number of loads as follows: - The number of regular loads (36) load. The number of horizontal loads (20) load. So that the total loads (56) load, required to provide 20 trucks with load of 50 ton equipped with a thread loading and meet all safety procedures and the required fuel, as well as providing 1 crane with a capacity of 60 ton served with the required safety reports attached with the presence of an observer to follow the transport convoy on its move, as well as requiring the carrier to provide fuel for cars. |
Bid Bond | 0.5% from bid total price |