Reference | Pre-12401 |
Date | 1/20/2011 |
Location | Africa |
Scope | 1. Periodical load testing (dynamic and static load testing) of 16-nos. lifeboats and davits including 2-nos. of rescue boats installed in Bouri Facilities (Dp4 Platform, DP3 Platform & Sloug FSU). 2. Load testing of lifeboat with eater ballasted. 3. Load testing of lifeboat without eater ballasted. 4. Maintenance services of the release hooks to include the full strip down and cleaning of the equipment. 5. Replace the hydrostatic disphragm of the equipment. 6. Equipment maintenance services of the winch brakes, drive chain and clutch. 7. Remove and inspect the condition of which foundation bolts torque back to its original position. |