Reference | 35.11.4091 |
Date | 3/23/2011 |
Location | Middle East |
Scope | Missan Oil Company intends to calibrate their oil storage tanks, which are located at AMARA field (5 km South Amara city). According to ministry of oil policy for calibration all tanks & metering equipments to meet metering system for approval of oil produced from AMARA field& comparing such quantities with the actual exported quantities. Calibration procedures should be clearly explained with your technical offer including the required certificate for each tank with a sufficient tables oil volume for each a definite level of the tank. Tank capacity tables are in accordance with the latest MPMS standards to obtain the maximum accuracy possible with a computer inventory system. Tank Technical Specifications: NO. Of Tanks = Two new installed storage tanks. Type of storage tanks = fixed roof tanks. Tank capacity = 5000 M3. Tank diameter = 30 m Height = 10 m Date of installation = 2011 Code = API 650 D. Calibration companies technical offers should include: - Calibration time schedual - Refrence list for similar works relating for this activity around Iraq & other reagional countries - Calibration activities within the site plant should meet the MOC safety rules applied there. Ambient conditions: Ambient temp. (Outdoors): min (22)? f, max (140) ?f. Relative humidity: min (20%), max (95%). The metering system should be suitable to operate in Out door where site environmental conditions are Characterized by sand storm. Atmo.pressure: 1020 m bar Rain interval: november to end of march. Snow: not to be seen. Wind velocity: 140 km/hr Design wind velocity: 160 km/hr. |
Bid Bond | 1% of the submitted prices |