Reference | RFP - 2322 |
Date | 4/17/2011 |
Location | Middle East |
Scope | Replace the supply line of current crude oil 16-inch diameter connecting between the center of the main assembly in abundance to the manifold Burgan TB-1. |
Bid Bond | KD 100,000.00 |
Documents Price | KD 2,000.00 |