Reference | LT11103800 |
Date | 5/5/2011 |
Location | Middle East |
Scope | Provision Of Separate Washing Areas Within Existing Laydown Yards within Dukhan Fields on EPIC basis. The work includes constructing separate Heat Exchanger tube bundle washing areas (15 M x 10 M area with proper slope) at all main degassing stations, FSP and FNGLCS (total 7 locations) within Dukhan Fields. Also, it is proposed to construct 20 Cubic Meters holding tanks to collect the wash water. |
Bid Bond | QAR 75,000.00 |
Bond Validity | 150 days |
Offer Validity | 120 days |
Documents Price | QAR 200.00 |