Scope |
The company intends to improve its operational processes, environmental controls and safety regime at its existing NGL Plants, Gas Operations by implementing additions and modifications.
The scope of work includes verification of engineering, procurement, supply of materials, installation, testing, inspection, pre-Commissioning and commissioning of 16 PCRs and replacement of seawater cement lined carbon steel piping with GRP/GRE material. This project is shutdown sensitive and is required to be implemented during the planned NGL-4 shutdown during Feb-March 2012. |