Scope |
The Contract scope is EPIC for Integrtated Oily Water / Sludge Handling System, New Drain System, Fire Protection for Crude Manifold and Pipeline Replacement at Halul.
The Scope is segregated into six systems which are- System 1: Replacement of the offshore portion of the 24" produced water disposal line to sea, System 2: Sludge mitigation/handling system for Crude Oil Storage Tanks, System 3: Refurbishing API Pit or Providing New one at Halul & Oily water drain system, System 4: Fire protection of the crude oil manifold, System 5: Replacement of the 12" PS-1 (OPQL) crude oil line from Pig Receiver to the manifold and System 6: Provision of internal kerb walls within North and South Tank Farms. |