| Reference | GT11109200 |
| Date | 7/14/2011 |
| Location | Middle East |
| Scope | EPIC of upgrading of instrument air compressors at gas distribution stations B, E, F & G at Mesaieed. Contractor shall carry out the Design and Detailed Engineering, Procurement, Installation, Construction, Pre-commissioning, Commissioning, and testing of the facility. Gas Distribution stations included in this Scope of Work are Stations B, E, F & G, of which Stations F & G are optional. Duration: eighteen (18) calendar months estimated start date: 01/10/2011. |
| Bid Bond | QAR 300,000.00 |
| Bond Validity | 150 days |
| Offer Validity | 120 days |
| Documents Price | QAR 500.00 |