Reference | GT11110400 |
Date | 8/1/2011 |
Location | Middle East |
Scope | Contractor shall carry out the work that includes site survey, verifying and/or amending the design and detailed engineering, procurement, material supply, installation / construction, inspection, testing, pre-commissioning and commissioning (EPIC) for implementation of the mechanical plant change requests (PCRs) at QP's NGL- 1 & 2 Plants in Mesaieed. The objective of this contract is to extend the major shutdown cycle for NGL-1/2 Plants from the normal two (2) years to four (4) years. |
Bid Bond | QAR 80,000.00 |
Bond Validity | 150 days |
Offer Validity | 120 days |
Documents Price | QAR 500.00 |