Egypt Zones accountACCOUNT
Replacement of 16” Condensate Line
Oil and Gas Pipeline
Reference RFP-2280
Date 10/16/2011
Location Middle East
Scope The works to be carried out by the Contractor are for site survey, design and engineering, HSE related works, procurement, inspection, supply of materials, construction, installation, testing and commissioning, performance testing, and putting into successful operation and handing over of a new 20” dia. pipeline from Gas & condensate Manifold up to LPG Plant inside KNPC Refinery, together with all associated mechanical, pipeline and piping works; civil and structural works; electrical works; cathodic protection and corrosion monitoring works; instrumentation and telemetry works; fire safety and security system works; and removal of the existing 16” Condensate Line from Manifold GCMB to Manifold MAA-0 2.

Bidding Information

Bid Bond KD 150,000.00
Documents Price KD 2000.00
Oil and Gas Pipeline
Related Prooducts: Oil and Gas Pipeline General LNG Carriers LNG Terminal Natural Gas Storage Oil and Gas Pipeline Oil Storage Railways Tank Truck Tankers
Related Tenders: General LNG Carriers LNG Terminal Natural Gas Storage Oil and Gas Pipeline Oil Storage Tank Truck Tankers

Related Articles

For Buyers
Advertise your Purchasing Requests

For Suppliers
Promote your Products
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.