Scope |
The Scope of Work shall include but not limited to Site survey, studies, engineering and Construction Tender package necessary for the Conceptual and Detailed Design for New Sports facility at Halul Island. The New Sports facility is a new 2- storey multi-purpose Sports facility complete with external games court. Minimum 5 years consultancy and detailed design experience in Oil/Gas Industry along with planning and design of infrastucture of Indoor Sports Complex is mandatory with rigorous liason with QP end users is anticipated. In addition, experience of using Oil and gas industry codes in designing utilities system such as potable water, sea water and fire water in an Oil and gas production facility is an added advantage. Duration of works is 8 months. |