Reference | LT12101000 |
Date | 1/19/2012 |
Location | Middle East |
Scope | The Scope of Work includes the following: - Design, supply, construction, dismantling, demolition, testing and commissioning of the integrated 2 x MPSU4000 system in single cabinet for telecom purposes at various locations within Dukhan Fields. - Installation of all the related components for the redundant 2 x MPSU4000 system. - Installation of all the cabling required to complete the Work. |
Bid Bond | QAR 60,000.00 |
Bond Validity | 150 days |
Offer Validity | 120 days |
Documents Price | QAR 200.00 |