Egypt Zones accountACCOUNT
Installing and Operating Steam Boiler
Boilers
Reference 9-2011
Date 1/15/2012
Location Middle East
Scope The project will cover the following: design, supply, erection and operating steam boiler, the project (on turn key job basis).

The project will be delivered to HRC in guaranteed conditions workings. The boiler should be prefabricated and can be put together in on year , at most, according to the following technical specifications :
- Outlet steam pressure: 38 kg/ cm².
-Outlet steam temperature: 450±5 C°.
- Outlet steam quantity: 25 t/h at least.
- Number of the burners: according to design / preferred with two burners.

Bidding Information

Bid Bond Euro 72,000.00
Boilers
Related Prooducts: Boilers Air Conditioning & Refrigeration Blowers Boilers Emulsifiers Furnaces General Heat exchangers Mixers, Static Steam Generators
Related Tenders: Agitators & Mixers Air Conditioning & Refrigeration Bailers, Sand Blowers Boilers Cooling Towers Dryers, Drying Machinery & Equipment Emulsifiers Furnaces General Heat exchangers Steam Generators

Related Articles

For Buyers
Advertise your Purchasing Requests

For Suppliers
Promote your Products
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.