Scope |
The Scope of Services shall include Front-End Engineering Design (FEED) for the centralized wastewater & sewage treatment plant at halul island. The scope shall also include but not limited to Site survey, studies, engineering and preparation of EPIC tender package for the Centralised Wastewater and sewage treatment plant inclusive of sludge management, pipe network & pumping stations and abandonment of existing septic tanks in meeting the increased number of personnel on the Island. Minimum 5 years consultancy and FEED experience in the Design of centralized, combined grey and sewage water treatment facility using Membrane Bioreactor (MBR) technology along with experience in Oil/Gas Industry is an added advantage. Duration of works is 8 months. |