| Reference | GT12107800 |
| Date | 5/28/2012 |
| Location | Middle East |
| Scope | EPIC for facilities to inject Khuff gas into Arab D gas cap during Non-availability of North field Gas, this is required to maintain the reservoir pressure to enable sustained production from Arab D. Following Facilities are involved: 1) 6"x 200m p/l from station H to 16" main Header. 2)6" x 200m P/l from L to 16" Main Header. 3)16" x 1.7 km p/l from main header to NFIS 4)New auto varaible pitch fans at NFIS 5)Lube oil pumps for compressor at Arab d |
| Bid Bond | QAR 2,000,000.00 |
| Bond Validity | 150 days |
| Offer Validity | 120 days |
| Documents Price | QAR 500.00 |