Reference | BID12954 |
Date | 7/29/2012 |
Location | Africa |
Scope | The pre-qualification is divided into the following parts: Part1: - 3rd party rig inspection Part2: - Casing and tubing NDT inspection - Downhole equipment NDT inspection - Tubular and tools inspection services |