Reference | LT12110800 |
Date | 8/26/2012 |
Location | Middle East |
Scope | Operation and Maintenance of two Incinerator units on Halul. The incinerator Plant consists of 02 Gencor Beverly 300kg/hr Solid Waste Incinerator units with an Enetex Gas Clean-Up System. Contractor shall carry out the operation and maintenance of the two (02) Incinerator Units at Halul for a period of three (3) years from the effective date of commissioning and handover to QP on completion of refurbishment. Proposed Start Date: 13/11/2012. |
Bid Bond | QAR 80,000.00 |
Bond Validity | 150 days |
Offer Validity | 120 days |
Documents Price | QAR 200.00 |