Reference | A47/2013/001S Drilling Rig Services – Prequalification of Bidders |
Date | 1/23/2013 |
Location | Africa |
Scope | The company intends to issue a Call for Tender for the supply of 1500HP Drilling Rig for Drilling. Well Design: * 20 Conductor pre-set * 17 ½” hole – 13 3/8” casing to 3300 feet * 12 ¼” hole – 9 5/8” casing to 7600 feet * 8 ½” hole – 7” Liner 11,000 to 7400 feet * 1000 feet of 3 ½” EUE Kill string run in hole prior to rig release Main Components: * 1500 HP is most preferable 2000HP is also accepted , SCR powered, fast moving, depth rating to 15,000 feet Drilling Rig * The rig must be in Libya * 750,000 minimum Derrick rating with 500,000 lbs hook load capacity * 500,000 lbs set back * Top Drive, minimum 1000 HP * 2 x 1500 HP Mud pumps * 1800 – 2400 bbls Mud System * 1200 - 1600 bbls water storage * High speed Shale shakers, desander and desilter * Connections for centrifuge tie-ins * Adequate electrical power for 3rd party centrifuge contractor * 5000 psi BOP and related equipment * 12,000 feet 5” Grade G or 105 drill pipe * 9 ½” Drill collars (6) * 8” Drill collars (24) * 6 ½” Drill collars (30) * 4 ¾” Drill collars (24) * 5,000 feet 3 ½” Grade G or 105 Drill pipe * 80 – 100 man master-skidded camp * Wellsite Office for Company Supervisor * Wellsite Office/Lab for Geologist * Wellsite office for Company Safety/Operations Supervisor * Wellsite Sleepers for Supervisors (2), Geologist (2), Safety/Operations Supervisor (2) Ancillary Equipment: * 40 Ton Crane and Operator with 24 hrs operator coverage * 12 Ton Forklift or Front end loader with 24 hrs operator coverage * Oilfield bed truck and trailer designated to rig * Complete fishing equipment for contractors downhole tools * Casing handling equipment for Operators casing string design * Crew Pickup * Toolpusher Pickup * Water transfer pumps and transfer lines for water transfer between reserve pit and rig and between reserve tanks and rigs tanks * Telecommunication system for contractor usage Please identify the following with selected Rig Availability: * Rig Number * Age of Drilling Rig * Origin of Drilling Rig * Age of Camp * Origin of Camp * Date of last Rig Inspection * Date of last Tubular Inspection * Rig specific Accident record for previous 36 months * Last three Operators and duration of contract including area of work * List of Senior and Junior personnel * Company training grid for Rig personnel * Valid certificate of the Rig |