Reference | BID1880 |
Date | 9/22/2005 |
Location | Middle East |
Scope | The Contractor shall carry out drilling, workover and completion of wells within the capacity of the Rig specified in the document, including but not limited to the following: - Run and set casing or liner to full depth of each hole or as specified by the Company; Run-in hole or pull out of hole completion packers and tools or electrical submersible pumps with tubing up to drilled depth of well; Swab/complete and test the wells as required; Run/pull out of hole any other packer or tools as specified by the Company. Issue Date: 22/9/2005 Closing Date: 26/10/2005 15:00 Question Closing Date: 10/10/2005 |