Egypt Zones accountACCOUNT
Pipeline Road Crossing Maintenance on a Call Off Basis in the Dukhan Fields
Pipes
Reference BID2041
Date 10/24/2005
Location Middle East
Scope Contractor shall carry out the following Work on Call-Off basis: (a) Construction of temporary access roads during Road Crossing replacements., (b) Excavation of designated 2", 3", 4", 6" and 8" road crossing pipe lines and preparation for inspection., (c) Re-coating of the excavated pipeline after inspection.
(d) Replacement of corroded 2", 3", 4", 6" and 8" road crossing pipe lines as per inspector recommendations., (e) Installation and Maintaining of Sacrificial Cathodic Protection., (f) Reinstatement of roads after completion of road crossing.

Bond: QR 450,000/--
Issue Date: 24/10/2005
Bid Closing Date: 11-Dec-2005 11:00 AM Local (GMT +0300)
Location: Qatar
Fee: QR 2000
Bond Validity: 10/05/2006 - (150) days from the Bid Closing Date
Offer Validity: 10/04/2006 - (120) days from the Bid Closing Date
Pipes
Related Prooducts: Pipes General Hydraulic Hoses Iron Pipes Pipe Cleaning Equipment Pipe Drilling and Tapping Pipe Inspection & Testing Equipment Pipe Lining, coating & insulation Pipe Locating Equipment Pipe Repair Pipeline Heating Equipment Piping Accessories Plastic Pipes PP Pipes PVC Pipes Rubber Hoses Stainless Steel Stainless Steel rods Steel Pipes
Related Tenders: Anchors General GRP Pipes Hydraulic Hoses Iron Pipes Metallic Hoses PE Pipes Pigs Pipe Cleaning Equipment Pipe Drilling and Tapping Pipe Inspection & Testing Equipment Pipe Lining, coating & insulation Pipe Locating Equipment Pipe Repair Pipe, Casing & Tubing Piping Accessories PTFE Rods Rubber Hoses Stainless Steel Stainless Steel rods Steel Pipes

Related Articles

For Buyers
Advertise your Purchasing Requests

For Suppliers
Promote your Products
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.