Reference | BID2041 |
Date | 10/24/2005 |
Location | Middle East |
Scope | Contractor shall carry out the following Work on Call-Off basis: (a) Construction of temporary access roads during Road Crossing replacements., (b) Excavation of designated 2", 3", 4", 6" and 8" road crossing pipe lines and preparation for inspection., (c) Re-coating of the excavated pipeline after inspection. (d) Replacement of corroded 2", 3", 4", 6" and 8" road crossing pipe lines as per inspector recommendations., (e) Installation and Maintaining of Sacrificial Cathodic Protection., (f) Reinstatement of roads after completion of road crossing. Bond: QR 450,000/-- Issue Date: 24/10/2005 Bid Closing Date: 11-Dec-2005 11:00 AM Local (GMT +0300) Location: Qatar Fee: QR 2000 Bond Validity: 10/05/2006 - (150) days from the Bid Closing Date Offer Validity: 10/04/2006 - (120) days from the Bid Closing Date |