Egypt Zones accountACCOUNT
Remedial Works to Jetty Structure of Mina Al Fahal Harbour
Dredging
Reference BID7518
Date 3/22/2009
Location Middle East
Scope Ref. No.: C211559
Issue Date: 22/03/2009
Bid Closing Date: 30/05/2009
Planned Award Date: 27/06/2009

Scope of Work:
Petroleum Development Oman (PDO) intends to install scour protection as remedial works of the undercut jetty of the Mina Al Fahal Harbour. The scope of the remedial Works Package is summarized as follows:

1. Provision of repairs of the scour cavities at the foot of the existing quay wall by means of grout fill.
2. Dredging of existing seabed materials for the installation of the scour protection and additional dredging to a level -3.0 M CD of the seabed where the water depth has been reduced due to sedimentation.
3. Installation of a toe block together with an interlock system of precast concrete blocks resting on a preplaced filter rock layer.
Dredging
Related Prooducts: Dredging Diving Contractors Dredging FPSO Vessels and Equipment General Marine Services Mooring Systems Offshore Platforms Subsea Production
Related Tenders: Diving Contractors Dredging FPSO Vessels and Equipment General Marine Services Mooring Systems Offshore Platforms Subsea Production

Related Articles

For Buyers
Advertise your Purchasing Requests

For Suppliers
Promote your Products
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.