Reference | BID7595 |
Date | 3/29/2009 |
Location | Middle East |
Scope | Ref. No.: 97091004 Issue Date: 29/03/2008 Bid Closing Date: 13/05/2009 at 01:00 Clock P.M Fee: ID 50000 Bid Bond: 1% From the total value of tender price Offer Validity: 90 days from the Bid Closing Date Address: Iraq - Ministry of Oil, North Refineries Company - Baiji Scope of Work: To reach the required capacity the contractor should rehabilitate and extend the existing unit by adding special items, as listed below: 1. Install Disk oil equipments to separate the oily materials which, coming to the unit, have the following specifications: 50 m3/h capacity, 4 bar pressure. 2. Install (CPI) to separate oily materials from waste water with 180 m3/h capacity. 3. Construct and build slope oil tank for separated oily materials with 636 m3 capacity. 4. Install additional pump (160-P-01C) with the following specification: 180 m3/h capacity, 2 bar pressure, 18.5 kW engine. Materials and Required Items: # 1 CPI unit, # 2 Slope oil tank, # 1 Disk oil, # 10 Ejector, Pipes and Flanges, Storage tank for oil, Complete pump with base plate & coupling & electrical motors, Control system, Fire protection requirements. |