Reference | BID7657 |
Date | 4/8/2009 |
Location | Middle East |
Scope | Ref. No.: 96-09-3901 Issue Date: 08/04/2009 Bid Closing Date: 01/05/2009 Fee: 600 USD Bid Bond: 1% From the total value of tender price Offer Validity: 120 days from the Bid Closing Date Bond Validity: 90 days from the Bid Closing Date Company: South Oil Company (SOC) Scope of Work: Supply of # 2 horizontal centrifugal main pump assay C/W electric motor including local starter and control panel; suction & discharge (M.O.V) valves, instrument gauges and all accessories on skid as the following Pump specifications: Capacity: 350 m3/h. Head: 270 m. Suction pressure: 7 kg/cm2 Liquid handled: crude oil. S.G: 0.84 Operating temp =55°c Type of seal: mech seal (flow serve or equivalent) plan 31 Type of coupling: flexible coupling metastream Casing: radial split Materials: API stander 610. S8 last addition Valves (M.O.V) syncro back 380 v, 50 hz Suction nozzle = 12", discharge nozzle = 8" Number of stages =2 stages Pump efficiency greater than 70 % Drain and vent valves flanged drain connection. Electrical specifications: Horizontal induction motor 3 phase, 11000 v, 50 hz, Explosion proof EX -d 11 AT3, Insulation class f, Ambient temp. 55 °c, Duty: continues, Enclosure TEFC: IP code 55, Self ventilation standard motor protection, RPM = 2984, Connection: Star, Power factor: 0.9, Original of motor (Ansaldo, Genova Italy), Wr2 = 19.5 kg m2, 435 kw, 27, 3 a, IP 55, Type: ET 630 l 2, S/N: 63277. Control system: The pump should be provide with complete control and protection system as below: 1- Two transmitters with receivers for suction and discharge lines. 2- Two pressure switches & gauges for suction and discharge lines. 3- RTD's with receivers for pump casing and bearings and for electrical motor winding and bearings. 4- Vibration system (monitor and pickups). 5- Control panel to operated locally and remote. 7- Seal leakage to detection system. Recommended spare parts (mechanical and electrical) for two years operation must be included. Four sets of maintenance and spare parts catalogue must be included. Training for three engineers from (S.O.C.) and wittiness for three engineers at the performance test on the supplier account (for all cost) must be included. Training for three engineers from (S.O.C.) and wittiness for three engineers at the performance test on the supplier account (for all cost) must be included. Origin: Italy |