Reference | BID7743 |
Date | 4/15/2009 |
Location | Middle East |
Scope | Ref. No.: PRJ.09.4027 Issue Date: 15-Apr-2009 Bid Closing Date: 10-Jun-2009 Reissue Date: 12-Apr-2010 New Bid Closing Date: 10-Jul-2010 Offer Validity: (120) days from the Bid Closing Date Bond Validity: (90) days from the Bid Closing Date Fee: 600 USD Bid Bond: 1% From the total value of tender price Company: Missan Oil Company Scope of Work: The scope of work shall covers design, detailed engineering, procurement of equipment and materials delivery of equipment and materials CIP Maysan supervision and technical assistance during field construction, erection, testing and commissioning of gas sweating treatment unit. The unit should be designed for 80 mmscfd {(25-30) mmscfd from them is a sweet gas and need to be dehydrated only}. Construction should be carried out by MOC under supervision of supplier representatives. Scope of work also include detail design hook up drawing isometrics construction drawing, construction and commissioning producers...ect. to facilitate construction of the plant with minimum supervision. It shall include performance guarantees and equipment materials warranty for 12 months after provisional acceptance. |