Reference | BID7784 |
Date | 4/27/2009 |
Location | Africa |
Scope | Ref. No.: 517 Issue Date: 27/04/2009 Bid Closing Date: 18/05/2009 E-mail: PRE.ENQUIRY@enioil.com.ly Or to Address: Mellitah Oil & Gas Company (Oil Division), Dahra Kebira Street, P.O. Box 346, Tripoli-Libya Scope of Work: - Top-Side Equipment Installation & Modification: Detail design, procurement (excluding ES Pumps) transportation, and construction & installation of the topside activities and commissioning of the entire system and execution of the necessary platform modifications. - Chemicals handling & re-filling system Upgrading: Design, Supply, installation and top-side modification of portal feed containers. The work shall include engineering, procurement, construction; installation and top side modification of Portal feed containers on both DP3 & DP4. - Antiscale Inhibitor Injection Skids Replacement: Design, supply and installation of No.5 antiscale skids complete with, steel structure supports, equipment, tubing, valves, control panel and E&I equipments to replace the existing old three onboard DP4 and two onboard DP3. |