Reference | BID7785 |
Date | 4/26/2009 |
Location | Middle East |
Scope | Ref. No.: PRJ.09.4037 Issue Date: 26/04/2009 Re Issue Date: 24/08/2009 The New Bid Closing Date: 10/092009 11:00 hrs Local (GMT + 0300) Company: Missan Oil Company Scope of Work: Drilling and completion of 30 wells on turn key basis as following: 1- (10) ten wells in Halfaya field. 2- (10) ten wells in Noor field. 3- (10) ten wells in Abu Ghirab field. 1- Halfaya oil field: Drilling, completion and handover of (10) ten vertical wells / producer in Halfaya oil field (Mishrif reservoir) to depth 3350 m on turn key basis (with material & services price list / well). 2- Abu Ghirab oil field: Drilling, completion and handover of (10) ten vertical wells / producer in Abu Ghirab oil field (Asmary reservoir) to depth 3350 m on turn key basis (with material & services price list / well). 3- Noor oil field: a. Mishrif reservoirs: Drilling & completion of (5) five vertical wells (producer) (3700 +/-25) m on turn key basis (with material & services price list / well). b- Nahr-Umr reservoirs: Drilling & completion of (5) five vertical wells (producer) (4150 +/-50) m on turn key basis (with material & services price list / well). Duration: - Completion of work should be within (12) months, starting (6) months after the date of opening clean & acceptable L/C in favor of contractor. - Duration of contract is (21) month starting from date of opening of L/C to end the contract. Materials: 1- Well head & X-mass tree. 2- Casing & liner hunger. 3- Casing accessories. 4- Tubing. 5- Completion equipment. 6- Cement & cement additives. 7- Bits. 8- Mud materials. Equipments: 1- Drilling rig. 2- Solid separation equipments. 3- Mud lab. full equipped with all devices and chemicals required for mud testing according to API standard required in details. 4- Bops, chock manifolds, kill & chock lines, driller remote chock-burning line and all safety regulation system - details required. 5- Offices for MOC rig supervisors - good sanitary standard, furniture, computers & software for drilling operations, cementing & mud control. 6- Three cars for MOC rig supervisors. 7- Cement pumping units. 8- Open & cased hole logging services, equipment, trucks & ACC. 9- Fire extinguishers & other fire fighting equipment. 10- H2S gas detections equipment & masks. 11- Communication facilities for rig sites and camp and offices (MOC & contractor). 12- Security for camps, rigs & contractor personal. |