Reference | BID7789 |
Date | 4/26/2009 |
Location | Middle East |
Scope | Ref. No.: PRJ.09.4042 Issue Date: 26/04/2009 Bid Closing Date: 15/05/2009 11:00 hrs Local (GMT + 0300) Company: Missan Oil Company Scope of Work: Drilling and completion of 30 wells on turn key basis as following: 1- 15 wells in Halfaya and Amara fields. 2- 15 wells in Abu Ghirab and Fauqi fields. 1- Drilling, completion and hand-over of fifteen vertical wells / producer in (Amara, Halfaya) oil fields: a. Halfaya oil field: Drilling & completion of (4) four vertical wells (producer), (Sadi & Mishrif) reservoirs. Drilling & completion of (6) six vertical wells (producer), (Sadi & Nahr Umer) reservoirs. b. Amara oil field: Drilling & completion of (4) four vertical wells (producer), (Khasib & Nahr-Umer) reservoirs. Drilling & completion of (1) one vertical well (producer), (Khasib & Mishrif) reservoirs. Duration: Completion of work should be within (18) months, starting (60) days after the date of opening clean & acceptable L/C in favor of contractor. Duration of contract is (24) month starting from date of opening of L/C. 2- Drilling, completion and handover of fifteen vertical wells / producer in (Abu Ghirab & Fauqi) oil fields: a. Abu Ghirab oil field: Drilling & completion of (7) seven vertical wells (producer), (Asmari & Mauddud) reservoir as follows: Drilling (5) five wells to Asmari formation. Drilling (2) two wells to Mauddud formation. b. Fauqi oil field: Drilling & completion of (8) eight vertical wells (producer), (Asmari & Mishrif) reservoir as follows: Drilling (4) four wells to Asmari formation. Drilling (4) four wells to Mishrif formation. Duration: Completion of work should be within (24) months, starting (60) days after the date of opening clean & acceptable L/C in favor of contractor. Duration of contract is (30) month starting from date of opening of L/C. Materials: 1- Well head & X-mass tree. 2- Casing & liner hunger. 3- Casing accessories. 4- Tubing. 5- Completion equipment. 6- Cement & cement additives. 7- Bits. 8- Mud materials. Equipments: 1- Drilling rig. 2- Solid separation equipments. 3- Mud lab. full equipped with all devices and chemicals required for mud testing according to API standard required in details. 4- Bops, chock manifolds, kill & chock lines, driller remote chock-burning line and all safety regulation system - details required. 5- Offices for MOC rig supervisors - good sanitary standard, furniture, computers & software for drilling operations, cementing & mud control. 6- Three cars for MOC rig supervisors. 7- Cement pumping units. 8- Open & cased) hole logging services, equipment, trucks & ACC. 9- Fire extinguishers & other fire fighting equipment. 10- H2S gas detections equipment & masks. 11- Communication facilities for rig sites and camp and offices (MOC & contractor). 12- Security for camps, rigs & contractor personal. |