Reference | BID7844 |
Date | 5/7/2009 |
Location | Middle East |
Scope | Ref. No.: General Tender #GT09106300 Bond: QAR 1,000,000 Fee: QAR 500 Issue Date: 07/05/2009 Bid Closing Date: 07/06/2009 11:00 hrs Local (GMT +0300) Bond Validity: 04/11/2009 - (150) days from the Bid Closing Date Offer Validity: 05/10/2009 - (120) days from the Bid Closing Date Location: Contracts Dept., Operations Division, Qatar Petroleum, PO Box 3212, Royal Plaza, G Wing, 4th Floor Rm G13, Doha. Scope of Work: Contractor shall undertake and complete the complete shutdown maintenance works of Static equipment, including without limitation all Instrument, Electrical, Civil works inclusive of valves and related pipe-works in NGL-3 Plant and associated utilities areas located within the NGL complex, Gas operations at Mesaieed Industrial Area in accordance with the specified job list and scope of work, Detailed job plans, Specifications, Standards and codes of practice. NGL-3 Plant shutdown is scheduled in November 2009 (tentatively) for a period of 28 days inclusive of plant decommissioning & commissioning. Planning and execution of work includes various turn around related activities including but not limited to Pre/Post turn around activities, Multidisciplinary maintenance, Inspection and repairs of piping, equipment and systems; Scaffolding/insulation/painting related activities, Supply of manpower services, Equipment and miscellaneous resources. Contractor shall be an ISO accredited company with demonstrated capabilities/certifications in ASME "U" & NBBI "R" repairs activities". In case the contractor does not have capabilities/certifications in ASME "U" & NBBI "R" activities, a sub contractor with demonstrated capabilities/certifications in ASME "U" & NBBI "R" activities shall be engaged for carrying out those activities which require these capabilities/certifications. Contractor shall be able to mobilize its sub contractor within 12 hours of notice during the shutdown. |