Reference | BID7876 |
Date | 5/6/2009 |
Location | Middle East |
Scope | Ref. No.:PRJ-09-3933 Issue Date: 06/05/2009 Bid Closing Date: 01/06/2009 Fee: 600 USD Bid Bond: 1% From the total value of tender price Offer Validity: 120 days from the Bid Closing Date Bond Validity: 90 days from the Bid Closing Date Company: South Oil Company (SOC) Scope of Work: South Oil Company (SOC) intend to have complete ultrafilteration water treatment unit for water injection services capable of producing clarified and treated water with 2 micron particals max. at continuous total flow rate of 750 m3/hr based on three lines 250 m3/hr for each with flexibility to produce treated water at a rate 250, 500 and 750 m3/hr for CPS4. The unit required shall be packaged prefabricated and complete skid mounted and shall be designed to take raw water from existing pipeline then treat, deliver and inject it to water wells. The scope of work consists of the following as minimum: 1- Design, detail engineering, drawing for all systems including isometric drawing & fabrication drawing operating and maintenance documentation (3 hard copies & 3 electronic copies). 2- Chemical pretreatment: - Coagulant addition - Chlorine solution - Hydrochloric acid 3- Ultra filtration plant - UF basins - Hollow (outside-in) immersed membranes - Permeate pumps - Filtered water tank - Filtrated water pumps 4- Vacuum deoxygenation plant - Deareation tower - Vacuum pumps - Residence tank - Deoxygenated water pumps - Chemicals 5- Final polishing filter 6- UF BW recovery system 7- Instrument and control package 8- Electrical package 9- Two years spare parts for complete system itemized and priced. 10- Fat test for 4 SOC engineers. 11- Supervision during installation and commissioning. 12- Design approval for ten soc engineers for 15 days including full board accommodation and travels. |