Reference | BID8060 |
Date | 5/17/2009 |
Location | Middle East |
Scope | Ref. No.: 96.08.9008.01 Issue Date: 17/05/2009 Pre-Tender Meeting Date: 02/06/2009 (will be held in the contracts Dept., North Oil Company (NOC), Kirkuk, Iraq) Bid Closing Date: 14/06/2009 Offer Validity: 5 months from the Bid Closing Date Document Price: 65,000 Iraqi Dinars Bid Bond: 1% From the total value of tender price Work Description: Complete fire fighting pump for IT1A: Name: Worthington pump Type: 8LN21 / Single stage Serial NO. 0 - 46403 Capacity: 892 m3 / h - head: 105.6 mlc Weight: 500 Kg for one pump size 14"x18" 380 volt / 450 KW / 50 Hz / 1460 RPM with alignment catalog. |