Egypt Zones accountACCOUNT
Water Well Drilling services
Drilling
Reference BID8544
Date 7/6/2009
Location Africa
Scope Future tenders reference GLBV/DRILL/A- 64/09/23 onshore
Issue Date: 06/07/2009
Bid Closing Date: 01/10/2009
Address: Gazprom Libya B.V., Ali Ben Abi Taleb Street, Ben Ashour Tripoli
E-mail address: john.sutcliffe@gazprom-libya.com
With copy to: jeanlouis.checa@Gazprom-Libya.com

Scope of Work:
Drilling of minimum six water supply wells for exploration well locations in onshore Area 64: Operations estimated start date – late Q1, 2010.

Potential Contractor must have or be able to provide the following:
1- Contractor shall provide all personnel, equipment and materials to comprise an independent, self supporting Water well drilling spread including,
a- Water Well Rig min up 950hp complete with camp, two mud pumps, space under rig floor for BOPs if required, Mud System min 120m 3.
B- Sufficient transportation to move the Rig and camp without assistance.
C- Rig shall be capable of drilling to minimum 2400feet.
d- Ability to run standard length +/- 9 5/8.
2- All equipment used shall be fully documented with specification of dimensions, weight, inspection, identification of hazards, calibration, certification, compliance with API standards and shall be checked by Company’s representative against the contract and inventory list.
3- Contractor shall maintain a full inventory of backup parts, equipment and workstations required for repair, maintenance and calibration to ensure a continuous provision of the Services.
4- Contractor is to ensure that all consumables required to fulfill the Services are available at the well site in due quantity (in a container) throughout the whole duration of the Services.
5- Company will inform Contractor before work commences the exact location of the water wells but this will probably not be before late Q1, 2010.
6- Contractor should be ready to mobilize as soon as first well locations are fixed . Contractor will probably have to drill 2 or 3 wells then stand down for extended period before the locations of the next wells are fixed according to the results of the initial drilling programme.

Responses should be marked with the following reference
“Water Well Drilling services Pre-Qualification. Area 64.”,
Drilling
Related Prooducts: Drilling Artificial Lift Cementing, Stimulation Drilling Drilling Engineering & Equipment Systems Enhanced Oil Recovery General Logging, Perforating, Testing Offshore Drilling Reservoir/Completion Consultants Workover & Well Services Workover Rigs/Services
Related Tenders: Artificial Lift Cementing, Stimulation Directional Drilling Drilling Drilling Engineering & Equipment Systems Enhanced Oil Recovery General Logging, Perforating, Testing Offshore Drilling Reservoir/Completion Consultants Workover & Well Services Workover Rigs/Services

Related Articles

For Buyers
Advertise your Purchasing Requests

For Suppliers
Promote your Products
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.