Reference | BID8607 |
Date | 7/20/2009 |
Location | Middle East |
Scope | Ref. No.: General Tender # GT09108800 Bid Bond: QAR 100,000 Fee: QAR 200 Issue Date: 20/07/2009 Bid Closing Date: 30/08/2009 11:00 hrs Local (GMT +0300) Bond Validity: 27/01/2009 - (150) days from the Bid Closing Date Offer Validity: 28/12/2009 - (120) days from the Bid Closing Date Location: Contracts Dept - Engineering Division, Qatar Petroleum - Doha, PO Box 3212, Ras Abu Aboud, Main Bldg, 2nd Floor, Room 233. Scope of Work: Engineering, Procurement Installation and Commissioning (EPIC) works for dedicated Uwainat gas line to Typhoon turbine at PS-2 consisting of the following: 1- Fuel gas conditioning skid consisting of: a- Filter Coalescer package (1 operating + 1 standby). b- Electric fuel gas heater. 2- 2" fuel gas supply line from tie-in location on PS-2C to inlet of fuel gas conditioning skid at PS-2G and from the skid to the inlet nozzle of Typhoon turbine. 3- Structural deck extension / modifications. 4- Associated electrical, instrumentation & control, fire & gas and loss prevention works. |