EPIC for Uwainat Gas Line to PS-2 Typhoon Turbine
Pipe Lines Installations
Reference BID8607
Date 7/20/2009
Location Middle East
Scope Ref. No.: General Tender # GT09108800
Bid Bond: QAR 100,000
Fee: QAR 200
Issue Date: 20/07/2009
Bid Closing Date: 30/08/2009 11:00 hrs Local (GMT +0300)
Bond Validity: 27/01/2009 - (150) days from the Bid Closing Date
Offer Validity: 28/12/2009 - (120) days from the Bid Closing Date
Location: Contracts Dept - Engineering Division, Qatar Petroleum - Doha, PO Box 3212, Ras Abu Aboud, Main Bldg, 2nd Floor, Room 233.

Scope of Work:
Engineering, Procurement Installation and Commissioning (EPIC) works for dedicated Uwainat gas line to Typhoon turbine at PS-2 consisting of the following:

1- Fuel gas conditioning skid consisting of:
a- Filter Coalescer package (1 operating + 1 standby).
b- Electric fuel gas heater.

2- 2" fuel gas supply line from tie-in location on PS-2C to inlet of fuel gas conditioning skid at PS-2G and from the skid to the inlet nozzle of Typhoon turbine.

3- Structural deck extension / modifications.

4- Associated electrical, instrumentation & control, fire & gas and loss prevention works.
Pipe Lines Installations
Related Prooducts: Pipe Lines Installations Civil Works Civil Works - General Construction Contractors Electrical Engineering Procurement and Construction (EPC) General Installations for water/waste water plants Mechanical Pipe Lines Installations Pumping Stations Steel Works
Related Tenders: Civil Works Civil Works - Finishing works Construction Contractors Electrical Works Engineering Procurement and Construction (EPC) Engineering Procurement and Construction Management (EPCM) General Mechanical Works Pipe Lines Installations Steel Works

Related Articles

For Buyers
Advertise your Purchasing Requests

For Suppliers
Promote your Products
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.