Reference | FAC-2010-CW822899 |
Date | 11/10/2010 |
Location | Africa |
Scope | The scope of work shall cover the demolition, transportation, installation and pre-commissioning of process and utility modules for the final installation and startup of the new pumping station in Escravos Terminal area. The services shall include but are not limited to: -Mobilization of personnel and equipment/plants to site necessary to execute project as per final detailed contractor's construction scope and other technical requirements. -Demolition of piping, equipment and foundations per technical requirements. -Transportation and safe disposal of the demolished equipment per CNL procedure. -Transportation of Company supplied material from the Company designated pick-up point to the construction site. -Fabrication of pipe spools and piping support. -Provision of construction material and other consumables as well as utilities not supplied by Company. -Installation activities per technical requirement but not limited to the following: Centrifugal pumps Surge vessel FloatationCell Electrical power cables and panels Pre-fabricated piping and associated valves Piping supports Instrumentation and control devices Pig Launcher Chemical Injection Skid -Pile foundation and associated concrete slabs. -Hook-up and Facilities commissioning support and compilation of As-built details. -Demobilization from site of personnel and all equipment/plants used for the successful execution of the project. |