Reference | T1/AT/88/285 |
Date | 12/11/2010 |
Location | Asia |
Scope | The company intends to open an International Two Stage Tender for carry out 14"pipe laying between BALAL Production Platform and Lavan Island and 12"pipe laying between AA and A9 Platform in the field. Performance Period: 20 months. |
Bid Bond | 27,000 EURO |
Offer Validity | 90 days |