Reference | 2521-11-006 |
Date | 1/11/2011 |
Location | Middle East |
Scope | The objective is to enlist a contractor to carryout Boiler Super heater tube Header and SH tubes replacement and other repair work. There are 2 Nos of direct fired boilers of 60 tons per hour capacity. Presently the company is anticipating repairs in one of these boilers. The SH tubes outlet header need to be replaced. The corresponding super heater tubes also need to be replaced. |