Reference | 2534-11-027 |
Date | 2/1/2011 |
Location | Middle East |
Scope | EPC for alternate routing to OPP Purge Gas during RFCC Shut Down. The scope of this project is to install a jump over line at the RFCC battery limits to allow carrier gas to be routed to the propylene storage tanks during RFCC shutdown for reprocessing. Installation of Tie-ins points for the line already completed during Nov 2010 Shutdown. |