Egypt Zones accountACCOUNT
Study of Halon Systems Replacement
Fire Protection & Suppressing Equipment
Reference NO.638
Date 2/8/2011
Location Africa
Scope The company intends to contract out a Feasibility Study of Halon Systems Replacement of all its fields and premises.

The Feasibility Study is intended to identify and evaluate proper alternative(s) to Halon 1301 as a flooding agent along with complete fire risk assessment, decommissioning & disposal of existing Halon Systems, as well as all other replacement requirements that are needed to proceed with safely and economically as per relevant international standards & codes.

The purpose of the study is to comply with the requirements of Montreal Protocol to phase out Ozone Depleting Substances (ODS), industry best practices and to avoid difficulties of refilling of released Halon cylinders & supply of spare parts.

Bidding Information

Fire Protection & Suppressing Equipment
Related Prooducts: Fire Protection & Suppressing Equipment Fire Fighting Vehicles & trucks Fire Protection & Suppressing Equipment Gas Detection equipment General Life Saving Equipment at sea Portable Extinguishers Pressure Relief & Rupture Devices Safety Equipment/Supplies Security Control Equipment Spill Control Equipment Tubular Inspection Equipment
Related Tenders: Fire Fighting Houses Fire Fighting Vehicles & trucks Fire Protection & Suppressing Equipment Gas Detection equipment General Life Saving Equipment at sea Portable Extinguishers Safety Equipment/Supplies Security Control Equipment Spill Control Equipment Surveillance Equipment Tubular Inspection Equipment

Related Articles

For Buyers
Advertise your Purchasing Requests

For Suppliers
Promote your Products
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.