Reference | BID900477 |
Date | 3/10/2011 |
Location | Africa |
Scope | The scope of work consists of activities required to accomplish, as a minimum, the Engineering and design, process, piping, structural, electrical and instrumentation works required to upgrade the existing fire fighting facility (FIFI NETWORK) at ODUDU (ODP1 & ODD1) in OML 100 concession. It shall include but not limited to: a) Detailed Engineering based on Basic Engineering supplied by the company. b) Definition, Expediting and Procurement of materials. c) Workshop fabrication of piping spools and steel structures. d) Onshore pre-assembly of FIFI Network module for (ODP1 & ODD1) including all necessary the company supplied equipment installation, structural steel, piping, electrical and instrumentation works. e) Load-out, sea-transportation and installation of the FIFI modules, separately on ODP1 & ODD1, and other materials, including provision of all necessary equipment (cranes, barges and vessels etc) necessary for the offshore installation works. f) All necessary offshore works on ODP1 & ODD1 (and the connecting bridge) including piping and E&I Tie-in works, plus all structural modifications on the existing ODP1 & ODD1 platforms. g) Pre-Commissioning and assistance to Commissioning activities. h) As-Built Dossier. The EPI works are scheduled to be executed between mid 2011 and mid 2013. |