Reference | LTC/OPF/1610/11 |
Date | 4/24/2011 |
Location | Middle East |
Scope | The Contractor has to carry out repair/replacement work on the existing submarine cable between Wellhead Platform 4 and Wellhead Platform 5 at North Field Bravo, and provide the jointing kits, logistics and other associated requirements for the job. This includes providing the required joints (Minimum 2 nos. - umbilical), doing online and offline tests after the repair, and guaranteeing the integrity of the repair. |
Bid Bond | QR 100,000 |
Documents Price | QR 300 |