Construction of Banias Gas Pipeline
Pipe Lines Installations
Reference 14 /2011
Date 4/10/2011
Location Middle East
Scope The company announces its need for engineering, procurement, supply and delivery, construction, commissioning and start-up for Banias refinery gas pipeline and custody transfer skid (cts)and pressure reduction and metering station (prms)project.

The project includes but not limited to the following:

The Banias refinery gas pipeline, and prms project mainly consists of the following activities:

- Engineering, procurement, construction and installation of the following first – the pipeline:

- Construction of approximately 9 km length of 24"gas pipeline extends from the outlet of new custody transfer skid at existing Banias prms inside the fence of banias power plant in banias city at the syrian coast to the new pressure reduction& metering station at Banias refinery to feed it with gas, ref to dwg-bref gp/l&prms - 5006-10-01 & 5006-10-02

- Installation of launcher at approximately 700 meter far away from the outlet of the new custody transfer skid at the existing banias prms, this 700 meter of 24" pipeline should be sloped 0.2% minimum toward prms and shall be connected with the existing drain and flare system.

NB. 9 km length of 24"gas pipeline includes the distance (700 meter)between the new custody transfer skid and the launcher l-5006.

Second- at existing banias prms:

- Construction of two metering lines (custody transfer skid) at the existing banias prms (2x100%) on as duty and the other standby with capacity 3.0mmscm/d for each line, the custody transfer skid shall be connected with the existing future flange 24" at r5005 of banias gas pipeline located at the existing banias pressure reduction and metering station(pr&ms) .

-On line gas chromatograph.

- Integration with the existing (dcs control/monitoring, safe guard & Emergency shutdown system.

- Scada system and full integration with dcs, scada systems for banias prms and gcc applications software.

- Integration with the existing fuel/instrument gas system.

- Integration with the existing blow down / vent system.

- Future connections 24" future valve.

- All kinds of utility systems needed.

- Etc.

And all associated piping, valves, instrumentation, civil work, fencing, Electrical and spare parts...etc.

Third- at banias refinery site:

- Pressure reduction & metering station with max capacity 1.0 mmscm/d consists mainly of the following equipment and materials ref. to the dwg-bref gp/l&prms 5006-10-02:

- One future valve to feed the hydrogen unit in the refinery with gas with max capacity 2.0 mmscm/d.

- Two pressure reduction and metering trains with filters (2x100%) one as duty and the other standby with capacity 1 mmscm/d for each train.

- One heat exchanger.

- Stand-by diesel generator

-(dcs) control system.

- Telecommunication system based on fiber optic cable.

- Blow down system.

- Utility/drain systems.

- Future connection equipped with required 24" valve, blind flange, ?bleed valve 0.5", and by pass line.

- All kinds of utility systems needed.

- Etc.

And all associated piping, valves, instrumentation, civil work, fencing, electrical and spare parts...etc.

Bidding Information

Bid Bond Euro 400000
Pipe Lines Installations
Related Prooducts: Pipe Lines Installations Civil Works Civil Works - General Construction Contractors Electrical Engineering Procurement and Construction (EPC) General Installations for water/waste water plants Mechanical Pipe Lines Installations Pumping Stations Steel Works
Related Tenders: Civil Works Civil Works - Finishing works Construction Contractors Electrical Works Engineering Procurement and Construction (EPC) Engineering Procurement and Construction Management (EPCM) General Mechanical Works Pipe Lines Installations Steel Works

Related Articles

For Buyers
Advertise your Purchasing Requests

For Suppliers
Promote your Products
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.