Reference | 14-2011 |
Date | 5/11/2011 |
Location | Middle East |
Scope | The company announces its need for Engineering, Procurement, Supply and Delivery, Construction, Commissioning and Start-up for BANIAS REFINERY GAS P/L& PRMS PROJECT in the Republic. “BANIAS REFINERY GAS P/L& PRMS PROJECT” Is defined as Engineering, Procurement, Construction, Commissioning and Start-up of BANIAS Gas Pipeline and Custody transfer Skid (CTS) and Pressure Reduction and Metering Station (PRMS). The work to be included in the contract embraces Engineering, detailed Design, Procurement, Delivery of Materials and Equipment, Construction, Equipment Installation, Pre Commissioning, Commissioning, Training Of Company's Staff, Documentation and Warranty. The project includes but not limited to the following: The Banias Refinery Gas Pipeline, and PRMS Project mainly consists of the following activities: · Engineering, procurement, construction and installation of the following First – the pipeline: - Construction of approximately 9 km length of 24"Gas pipeline extends from the outlet of new Custody Transfer Skid at Existing BANIAS PRMS inside the fence of Banias power plant in Banias city at the Syrian coast to the new Pressure Reduction& Metering Station at Banias Refinery to feed it with gas. - Installation of Launcher at approximately 700 meter far away from the outlet of the new Custody Transfer Skid at the Existing BANIAS PRMS, this 700 meter of 24" pipeline should be sloped 0.2% minimum toward PRMS and shall be connected with the existing drain and flare system. NB. 9 km length of 24"Gas pipeline includes the distance (700 meter) between the new Custody Transfer Skid and the launcher L- 5006. Second- at existing BANIAS PRMS: - Construction of Two Metering Lines (Custody Transfer Skid) at the Existing BANIAS PRMS (2X100%) one as duty and the other standby with Capacity 3.0MMSCM/D for each line, the Custody Transfer Skid shall be connected with the existing future Flange 24" at R5005 of Banias Gas pipeline located at the Existing Banias Pressure Reduction And Metering Station(PR&MS) . - On line Gas Chromatograph . - Integration with the existing (DCS Control/Monitoring, safe guard & Emergency Shutdown System. - SCADA system and Full integration with DCS, SCADA Systems For BANIAS PRMS and GCC applications software. - Integration with the existing Fuel/Instrument Gas System. - Integration with the existing Blow down / Vent system. - Future Connections 24" future Valve. - All kinds of utility systems needed. Third- at BANIAS refinery site: Pressure Reduction & Metering Station with Max Capacity 1.0 MMSCM/D consists mainly of the following equipment and materials: - One future valve to feed the hydrogen unit in the Refinery with gas with Max Capacity 2.0 MMSCM/D. - Two Pressure Reduction And Metering Trains With Filters (2X100%) one as duty and the other standby with Capacity 1 MMSCM/D for each Train. - One Heat Exchanger. - Stand-by Diesel Generator. - ( DCS ) Control System. - Telecommunication System based on Fiber Optic Cable. - Blow Down System. - Utility/Drain systems. - Future connection equipped with required 24" valve, blind flange, bleed valve 0.5", and by pass line. - All kinds of utility systems needed. |
Bid Bond | Euro 400,000 |
Offer Validity | 180 days |