Reference | 2010-D-B |
Date | 5/16/2011 |
Location | Middle East |
Scope | The project consists of the extension of a 10-inch length of about 10 km pipeline system Subject to clearance. The pipeline is between Snake and Irresistible stations. This work contains but not limited to the following: - Engineering study - Pipeline extension with all the pipes, related links and connecting it with the existing equipments - Supply of materials and equipment - Civil Works - Warranty and security of the project |
Bid Bond | SYP 700,000.00 |
Offer Validity | 120 days |
Documents Price | SYP 1,000.00 |