Egypt Zones accountACCOUNT
EPIC for 16'' Jet A1 pipeline
Oil and Gas Pipeline
Reference GT11106200
Date 5/16/2011
Location Middle East
Scope EPIC of 16'' Jet A1 Fuel P/L from the company refinery to BSV-3 Engineering, procurements/supply & construction of a dedicated system for the supply of JET A1 fuel from the company refinery to BSV-3 by 16 inch dia. pipeline. The estimated length of the pipeline between the company refinery and BSV-3 is about 36.0 km. The system also includes new pumping system (3 nos. Booster pumps & 3 nos. Mainline pumps will be installed in a new pump house inside the company refinery) & associated facilities.

Jet A1 Fuel is currently transported by a multi-product transfer system consisting of a pump station at the the company refinery, a 12 inch multi-product pipeline and a tank farm at Doha Depot situated in the Abu Hamour area on the southern outskirts of the city of Doha, via intermediate station BSV-3. From Doha Depot, it is transported to the existing airport by tankers. A new 18 inch multi-product pipeline, currently under pre-commissioning, will be used to transfer multi-products to Doha Depot. A new 16" Jet A1 Fuel pipeline from BSV-3 to STATION C-1 INSIDE NDIA is under EPIC stage and it is being constructed under contract ref. GC09106100 by DOPET.

Under this contract, the company is laying an estimated 16.5 km of 16 inch internally and externally coated buried pipeline from BSV-3 to STATION C-1 INSIDE NDIA including temporary Pig Launching facility and Tie-in to existing 12 inch multi-product pipeline at BSV3 & pig receiving facilities, filtration, separation, metering facilities with Satellite and Equipment room at STATION C-1 INSIDE NDIA. Since the condition of existing 12 inch multi-product pipeline from the company refinery to BSV-3 is not known, the company has decided to lay the proposed new approximately 36 KM long & 16'' dia. Jet A1 pipeline from the Refinery to BSV-3. Based on the above, purchase order has already been placed by the company for 16" line pipe API 5LX 60, 7.9 mm wall thickness for the Jet A1 Fuel pipeline project. The line pipe will be Free Issue Material for the EPIC Contractor.

Bidding Information

Bid Bond QAR 5,000,000.00
Bond Validity 150 days
Offer Validity 120 days
Documents Price QAR 500.00
Oil and Gas Pipeline
Related Prooducts: Oil and Gas Pipeline General LNG Carriers LNG Terminal Natural Gas Storage Oil and Gas Pipeline Oil Storage Railways Tank Truck Tankers
Related Tenders: General LNG Carriers LNG Terminal Natural Gas Storage Oil and Gas Pipeline Oil Storage Tank Truck Tankers

Related Articles

For Buyers
Advertise your Purchasing Requests

For Suppliers
Promote your Products
Egypt Zones
Copyright © Universal Solutions All rights reserved. - Privacy Policy.