Scope |
The company announces an external call for construction and executing the Dbessan Gas Station Project (on turn key bases).
The company plans to further development the southern fields of North Middle Area Gas Exploitation Project. The project involves collecting non associated gas from five drilled wells (AL Zamleh-1, AL Zamleh-2, AL Zamleh-4, South AL Rasafa-1, and AL kalaa-1 to a Gas test separation station (DTSS) located at Dbessan site. the collected gas from the DTSS will be pipelined to the north AL Hussein gas gathering station (NH station) location which is approximately 36kms far from the DTSS, the Pig receiver location at (NH station) is specified in the attached drawing. The proposed gathering system (DTSS) is located in a desert area with some gentle variations in the terrain.
|